Faith site security planning permission is not usually the first thing a place of worship thinks about when it decides to harden its perimeter, but a recent Surrey planning decision is a reminder that it should be near the top of the list. Surrey County Council has granted retrospective planning consent for two security kiosks, a CCTV and emergency control room, and internal access roads at the Ahmadiyya Muslim community’s headquarters in Tilford, near Farnham. The works were installed in direct response to specific threats shared with the council and police, but because the site sits on protected Green Belt land, the measures needed formal planning permission, which had not been obtained before construction began.
Council planning officers concluded that the kiosks and control room amounted to inappropriate development in the Green Belt and caused some harm to the protected landscape. They nonetheless granted consent, finding that the need to protect occupants, visitors and the wider public from a credible threat represented the “very special circumstances” required to justify development that would otherwise be refused. Local residents had objected during the process, raising concerns about overdevelopment and about the sequencing, the works went in before permission was granted, and some invoked loaded language accusing the community of using security as cover for broader expansion, criticism the council’s decision did not accept.
Why security hardening and planning law collide more often than sites expect
Security kiosks, perimeter fencing, control rooms, bollards and even some categories of CCTV installation can trigger planning requirements that have nothing to do with a site’s security need and everything to do with its location, listed status, or Green Belt designation. A faith site, school or corporate campus facing a genuine and documented threat can still find itself in breach of planning control if works go ahead before consent is secured, regardless of how justified the underlying security case is. The Tilford case shows that threat evidence can ultimately carry a planning application, but it is a far stronger position to have that evidence assessed before building than to seek forgiveness afterwards.
Getting security hardening right the first time
Any site planning to add visible security infrastructure, kiosks, control rooms, fencing upgrades, should involve a planning consultant alongside its security provider from the earliest stage, particularly where the site sits in a Green Belt, conservation area or near listed buildings. A documented threat assessment, ideally supported by police correspondence, strengthens any application substantially and should be prepared before, not after, physical works begin. Our corporate security and school and faith-site security teams work alongside clients’ own planning advisers to specify hardening measures that are proportionate to an assessed threat and realistic to get consented. Get Surrey’s reporting on the council decision and the Farnham Herald’s coverage of the local debate set out the full planning history.
Faith sites across the UK are increasingly being told, correctly, that they qualify for government protective security funding and should harden their premises. What the Tilford case adds is the less-discussed second half of that advice: hardening a site well means sequencing security works with planning consent, not around it, especially where the site’s location makes that consent anything but automatic.
Need a security review?
If your organisation is planning security hardening works and wants to get the planning sequencing right from the outset, our team can help scope proportionate measures and the supporting case for them. Call us on 020 3700 0967, email info@secureonsitesecurity.co.uk, or visit our contact page. Related services:
- Faith site and school security for community buildings assessing a documented threat.
- Corporate security services for organisations planning visible perimeter hardening.
- Residential security for linked premises and clergy or staff accommodation.
Getting faith site security planning permission sorted before, rather than after, building work begins is the difference between a straightforward application supported by threat evidence and a drawn-out retrospective fight that a genuinely threatened community should not have to have.